AV C Ride for 2/4 - Carmel in Woodside?
Hi Peloton,
Hopefully you will agree. I have another route that tests some less traveled roads, and still provides stimulation and adventure. We will go through the Woodside Glen neighborhood that reminds me of Carmel, and take a different road up through Emerald Hills. Huddard is open again. We will finish with Alpine and a quick trip up Sausal (by my childhood house) and a screaming descent. All total it is a little longer than last week with just a ting more climbing. It is easy enough to skip any of the climbs if you wish.
I will personally wait at all regroups so that if anybody should be OTB, they can be assured that somebody is waiting for them. This is meant to be a practice ride but we will allow people to hammer the hills, but let’s stay together on the “flats”. Please download the route if you wish.
AV C Ride
Time: Saturday, gather at 9am. rolling by 9:15am
Start: Summit Bikes - 392 California Ave, Palo Alto, CA Summit is Alto Velo's Sponsoring bike shop.
Route: Carmel in Woodside?
Stats: ~43mi, 3450 ft
The AV C Ride is subject to Alto Velo's Ride Rules (read them!).
Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.
The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.
Ed Stewart