Alto Velo C Ride Dec 28 ‘24

Starts at Summit Bicycles in Palo Alto

Route: (Crestview, Huddart, Westridge, FHP)
https://www.strava.com/routes/3307430955882644216

53 miles, 4.5k' vertical

Happy Holidays! For the last C ride of the year on what should be nice dry roads we are going to pile up the vertical feet while staying below the ridgeline.

The AV C Ride is subject to Alto Velo's Ride Rules (read them!) and all participants must sign an annual waiver.

Non - Members: Alto Velo welcomes non-members to join us on our ride; however, non-members must have a Waiver on file with the club.

Time: Saturday gather at 9:00am, rolling by 9:15am

Start: Summit Bikes - 392 California Ave, Palo Alto, CA
Summit is Alto Velo's sponsoring bike shop.

Protocol:

  • Helmets required, no sudden lateral moves, call out hazards, call out mechanical problems, ride at a steady pace, …, ask for a mentor if you are new to group riding

  • Jam as hard as you like on the climbs, occasional sprint for fun, soft pedal for an in-flight regroup when we get separated

  • Regroup at the top of every major climb and every significant descent — everyone descends at their own safe speed

  • Pay attention to the regroup locations and don’t pass them if you wish to stay with the group

  • If you breakaway before the first regroup please be encouraged to wait at the first stop (if the wait is too long we will break the ride into two fragments: drop and no drop)

Bring two water bottles

Regroups: Quick regroups after most climbs. Formal regroups with water/bathrooms at the Pulgas Water Temple (mi 19), Woodside Store after Huddart climb (mi 28) and Foothills Park before we lap it (mi 43).

Previous
Previous

Alto Velo C Ride Jan 4 ‘25

Next
Next

Alto Velo C Ride Dec 21 ’24