* Update: Alto Velo C Ride Nov-11- 23: Return to Normal Start Location

Hi Peloton

I have received a note from the AV Board of Director that says we must start our C Ride from the Cal Ave. location of Summit Bikes. Therefore, we will keep the same route but leave from Summit at 9:15. We will take Bol Park Bike Path to get to Los Altos It will add about 4 flat miles onto the original proposed route. I apologize about the confusion.

Brief description

We are talking a route we have done before. We will head south out of Los Altos and proceed through Stevens Canyon and into Saratoga. We head south on Highway 9 and over Highway 17 to climb Shannon and Kennedy. We ride back to Los Gatos to pick up some water, and then head back to Los Altos and Peet’s for some warm or cold beverages, etc.

Ed

AV C Ride

Time: Saturday, gather at 9am. rolling by 9:15am
Start: Summit Bicycles 
Route: Stevens Canyon, Shannon, Kennedy, Los Gatos, Trail of Tears
Stats: ~45mi, ~3200ft
_________________________________________________________________________________________

The AV C Ride is subject to Alto Velo's Ride Rules (read them!).

Non - Members:
Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club.

The AV C Ride offers a more moderate workout than the other Alto Velo rides (although a workout it is). Group riding skills & communication in a supportive controlled peloton are emphasized. When not on designated climbs, we aim to keep the group together.

Ed Stewart

Previous
Previous

AV-C Ride Nov-18, 2023: Rain route, “Looks like rain”

Next
Next

Alto Velo C Ride Nov4'23