AV-B Ride July 27th, 2024 - The Bike Hut Ride Reception

This week we will once again make our way towards Tunitas for the Bike Hut Classic Ride reception. Details from their website

“Stop by the farm behind the Bike Hut between 10am and 1pm to pick up your T-shirt; see the fastest times in each category; enjoy ice cream sundaes and live music; collect prizes for all raffle winners; and meet the staff at Abundant Grace Coastside Worker.”

I do recognize there has been a lot of Tunitas time in the last few weeks on the B-ride, yet I feel it’s a good call to show support for those that gave it their all for the Bike Hut Classic and the great organization that put it all together (and for ice cream).

The route will be slightly different this week, starting by climbing Page Mill, turning right on Skyline and rolling downhill towards 84 (for a less bumpy/twisty descent than West Alpine). After a water stop at Skylonda we will resume the normal Coastal Classic route and descend towards the coast, turning right on Stage and doing a slightly longer stop at the Bike Hut for the festivities. We will finally make our way back up Tunitas, and descend back down Kings Mountain before taking Whiskey Hill/Sand Hill to Backyard Brew.

Hope to see you then,

Nick F

The AV-B Ride is subject to Alto Velo’s Ride Rules (read them!)

Start / End Location

Summit Bicycles, California Ave

Route

The Bike Hut Ride Reception

60 mi, 5787 ft

Start Time

Meet: 9 AM

Leave: 9:15 AM

Ride Leader

Nick F

Regoups:

- Top of Page Mill (water)

- Skylonda (water)

- La Honda

- The Bike Hut (water/ice cream)

- Top of Tunitas

- Woodside Store (water)

Non-Members:

Alto Velo welcomes non-members to join us on our rides. However, non-members must have a Waiver on file with the club. Filling out the waiver is required one time per year.

Ride Etiquette: www.altovelo.org/ride-rules  

Previous
Previous

AV-B Ride Aug 3 ’24 - Black Rd

Next
Next

AV-B Ride July 20th, 2024 - Last Week of Bike Hut Classic