Sunday A Ride- 02.16.Boulder Creek
Wishing anyone who is racing Pine Flat tomorrow a fun and safe day.
If you are missing Pine Flat, you can join an “endurance” pace ride tomorrow. This Sunday we will head to Boulder Creek through Pagemill.
I will remain in Z2 in flat/roller sections (~ 2.5-3 W/kg pace) and I if you are on doubt just follow my pace. Feel free hammer the two longer climbs (page mill and Highway 9 out of BC) as long as you don’t mind waiting at the top where we will regroup. We will have 1 or 2 short water stops (5 min each) at fire station and/or Castle rock and a 20 min stop in Boulder creek before riding Highway 9 to Skyline.
https://www.strava.com/routes/3326058192332676900
Summary: 70 miles / 7,100 feet: Summit Bicycles > Stanford Ave > Old page > page > Skyline > summit> bear creak > Boulder Creek >9 > RWG >Foothill > Summit Bicycles
Start: Summit Bicycles, Palo Alto
Time: Meet 9:00 AM, Leave 9:10 AM
Ride etiquette: https://www.altovelo.org/ride-rules
Ride Leader: Hoss Hayati